Skip to Content
Blog and Projects

News, knowledge
and work on site.

Follow Syst-MP news, explore our technical content and discover installations, repairs and equipment supplies carried out by our team.

Waterfalls in a Syst-MP project
01

News

Company news, partnerships and external references.

KSB
News

2018

Partnership recognition · 2018

KSB highlighted the growth of its partnership with Syst-MP and recognised the professionalism and commitment of the team.

Read the KSB article →
Símbolo BECORPORATE BECORPORATE
Project

Project for Syst-MP

The project developed by BECORPORATE for Syst-MP is featured in the consultancy’s portfolio.

Explore the project →
Odoo
External reference

Organisation and digital transformation

Syst-MP is featured as an Odoo customer, integrating sales, purchasing, accounting, logistics and repair processes.

View the Odoo reference →
Choose another area ↑
02

Technical content

Explanations and care for a better understanding of your equipment.

Dry running: the pump is running… but is there water?
Technical content

11/11/2026

Dry running: the pump is running… but is there water?

Recognise the risks of water shortage and learn how to choose protection for your installation.

Read the article →
Technical content

Do you hear banging in the pipes?

A valve closes quickly. Pressure changes. A wave travels through the installation.

Watch the animation to understand water hammer and why diagnosis matters.

Explore the phenomenon →
Check valve: purpose and operation
Technical content

20/10/2026

Check valve: purpose and operation

How non-return valves work, where they are used and which signs warrant a technical check.

Read the article →
Why clean your pool pump’s pre-filter?
Technical content

05/10/2026

Why clean your pool pump’s pre-filter?

The pre-filter basket traps leaves, hair and other debris. When blocked, it restricts water flow and affects filtration.

Read the article →
Choose another area ↑
03

Works and projects

Installations, repairs and equipment supplies carried out by Syst-MP. Discover the context and solution for each job.

Fire pump station maintenance: work on site
Work or project

11/11/2026

Fire pump station maintenance: work on site

Original photographs of the Syst-MP team, pumping units and control panels during maintenance.

Discover the work →
Interior of the wastewater pumping station during the work
Work or project

22/10/2026

Submersible pump replacement and pumping station cleaning

Supply and installation of a KSB AmaPorter 500 ND, with cleaning by a specialist subcontractor.

Discover the work →
Fire pumping station maintenance
Work or project

20/10/2026

Fire pumping station maintenance

Checks, adjustments and operating tests, including the installation’s water storage tanks.

Discover the work →
Repair of a fire pumping station
Work or project

16/10/2026

Repair of a fire pumping station

Repairs to control panels, SKF laser alignment, flow measurement and the engine-driven pump exhaust pipe.

Discover the work →
Pipe leak repair
Work or project

15/10/2026

Pipe leak repair

Manual excavation to expose the buried pipe, followed by the installation of a repair clamp.

View the work →
Suction improvements and maintenance at a fire pump station
Work or project

15/10/2026

Suction improvements and maintenance at a fire pump station

Replacement of the suction manifold with a 4″ manifold, valves and tank level float, alongside pump station maintenance.

Explore the work →
Replacing the hydraulic assembly of a fire-fighting pump
Work or project

09/10/2026

Replacing the hydraulic assembly of a fire-fighting pump

Replacement of a pump’s hydraulic assembly in a hotel fire-fighting pumping station in the Algarve.

Explore the work →
Repairing wastewater pumps
Work or project

12/10/2026

Repairing wastewater pumps

Work on two pumps in an Albufeira pumping station and maintenance recommendations.

Explore the work →
Supplying a Kripsol OK71M pool pump
Work or project

05/10/2026

Supplying a Kripsol OK71M pool pump

A Kripsol OK71M pump supplied for a pool filtration system. The customer shared a photograph after installation.

Explore the work →
DN80 water meter installed at the hotel
Work or project

05/10/2026

Installing a DN80 water meter in a hotel

Supply and installation of a flanged DN80 meter in a hotel’s water network.

Explore the work →
Work or project

05/10/2026

Supplying electric motors for kitchen extract hoods

Supply of two three-phase 1.5 kW electric motors for a professional extraction system.

Explore the work →

Earlier projects

Vivenda Galé
Work or project

13/04/2021

Pool cover in Galé

Bubble cover for an 8 × 4 m pool, with a manual roller to make handling easier.

Explore the work →
Domestic hot water tanks
Work or project

29/01/2021

Domestic hot water tanks

Supply of a 5,000-litre CLISOL tank manufactured by JOTOCLAVE in AISI 316 stainless steel.

Explore the work →
Spa in Quinta do Lago
Work or project

22/12/2020

Spa in Quinta do Lago

Custom-built spa with an IBIZA submerged cover and grey polycarbonate slats.

Explore the work →
Fire-fighting pumping station
Work or project

21/12/2020

Fire-fighting pumping station

KSB/ITUR EDS EC-120/75 JEE pumping station, with a test set and flow measurement.

Explore the work →
Waterfalls and water recirculation
Work or project

11/12/2020

Waterfalls and water recirculation

KSB pumps supplying waterfalls and recirculating pond water, with remote control by SMS.

Explore the work →
Choose another area ↑

A solution for your project.

Talk to our team to choose the equipment and technical support you need.