Syst-MP carried out work at a fire pump station, focusing on suction improvements and equipment maintenance.

From the existing installation to the completed work

The 2½″ suction manifold was replaced with a 4″ manifold and two isolation valves. A 4″ flanged valve was installed at the fire water tank outlet. The work also included replacement of the level control float.

Before the work

Fire pumping station pipework and equipment before the work

After the manifold replacement

Suction manifold and valves at the fire pumping station

Pump station maintenance

The team checked and adjusted the equipment, including the pressure switches, relief valves and expansion vessel pressure. The pump sets, shaft alignments and water supply from the tank were also checked.

The work included parameter settings and operational tests.

Technician working on pipework connected to the fire station water tank

Our team during the work at the tank.

Syst-MP — always pumping.

About this work

What changed in the station’s suction system?

The 2½″ manifold was replaced with a 4″ manifold and two isolation valves. The work also covered the tank outlet valve, level float and station maintenance.

Technical support in Loulé and the Algarve

Based in Loulé, Syst-MP supports installations, maintenance and equipment supply in the Algarve. Contact our team to discuss the needs of your project.