Syst-MP worked on a fire pumping station after faults were identified during maintenance. The work covered the control panels, electric pump alignment, flow measurement and engine-driven pump exhaust pipework.
Electric pump alignment
The main electric pump was aligned using SKF laser equipment, with a report showing the measured and corrected values.
Excerpt from the work at the pumping station.
Control panel repairs
The repairs restored manual starting and stopping of the main and standby pumps. The 230/24 V transformer and control panel batteries were also replaced.
Flow measurement and pipework
A new 3-inch flow meter was installed and the associated pipework repaired. The work also included repairs to the engine-driven pump exhaust pipework.
Maintenance helps identify faults and plan the necessary repairs to the different components of the installation.